12:50AM: Power has been restored. Click here for more details on the outage.

Generation Facilities

aerial shot of the Manitowoc Public Utilities power plant along Lake Michigan

Manitowoc Public Utilities is committed to investing in renewable energy. As a support for that initiative, rooftop solar generation was installed on two water department buildings, including a battery storage system in one of the facilities, in an attempt gain experience with rooftop solar as well as the battery storage.

Southwest Booster Solar Array

Solar panels on a rooftop

Date Built: 2022
Size: 4.9 kW

Generation Displayed As Negative kWh:
January – April 2024

New York Reservoir Solar Array with Storage Battery

Solar panels on a rooftop

Date Built: 2022
Size: 4.9 kW
Battery Storage: 20 kWh

Generation Displayed As Negative kWh:
January – April 2024

Additionally, MPU built a community solar garden for customer participation. Learn more about that project.